Insolvency and resolution of construction contract disputes by adjudication in the UK construction industry
Abstract
The Housing Grants, Construction and Regeneration Act 1996 provides that a party to a construction contract has a right, at any time, to refer any dispute under the contract for adjudication. This resolution method requires a neutral third party, the adjudicator, to determine the dispute within 28 days after receipt of the referral regardless of the complexity of the issues in dispute. The decision is to be implemented even if it is palpably wrong in fact or law. A key assumption of this legislation is that any mistakes made by an adjudicator can be corrected by reference of the same to litigation or arbitration. It is a major concern that restoration of the parties to their correct positions may become impossible where, after implementation of an adjudicator's mistaken decision, the beneficiary of the decision becomes insolvent. This article is a critical review of all the cases in which the courts have dealt with the effect of insolvency on the right to adjudicate and the enforceability of adjudicators' decisions. Two main conclusions are derived from the review. First, the court may decline to enforce an adjudicator's payment decision where there is strong evidence that, on account of formal insolvency, the payee would be unable to make repayment if final resolution of the dispute necessitates it. Second, the only exception so far to the general right to refer to adjudication arises where the other party is in administration. (Taylor & Francis)Citation
Construction Management and Economics, 23(4): 399-408Publisher
Taylor & FrancisJournal
Construction Management and EconomicsType
Journal articleLanguage
enDescription
This study was carried out in collaboration with Fenwick Elliott, an international construction law practice.ISSN
014461931466433X
ae974a485f413a2113503eed53cd6c53
10.1080/0144619042000326747
Scopus Count
Collections
Related items
Showing items related by title, author, creator and subject.
-
Improving construction management practice in the Gibraltar construction industryDaniel, Emmanuel I.; Garcia, Daniel; Marasini, Ramesh; Kolo, Shaba; Oshodi, Olalekan; Pasquire, Christine; Hamzeh, Farook (Annual Conference of the International. Group for Lean Construction (IGLC), 2019-07-03)Research has shown that 57% of activities in a construction project is non-value adding (waste) which contributes to the poor performance of the sector. While other countries of the world such the USA, UK, Brazil, Nigeria and Israel among others are seeking to understand this challenge and deploy innovative ways and modern techniques to improve it, limited studies have explored factors that contribute to non-value adding activities (NVA) in the Gibraltar construction industry. The current study aims to identify the factors that contribute to NVA on construction sites in Gibraltar and to present an outlook on how this could be minimised using Last Planner System(LPS). A combination of quantative and qualitative research approaches were used. Thirtyone questionnaire responses were analysed and seven semi-structured interviews were conducted. The investigation reveals that the development of unrealistic schedules, lack of adequate training, delayed approval process and work interruption due to the community are the key factors that contribute to NVA. The study found that the suggestions offered by construction professional for minimising NVA align with some LPS principles. The study concludes that some of the current practices, could serve as justification for the introduction of LPS in the construction sector of Gibraltar.
-
Implementing 5D BIM on construction projects: Contractor perspectives from the UK construction sectorMoses, Tochukwu; Heesom, David; Oloke, David (Emerald, 2020-05-09)Purpose The purpose of this paper is to report on primary research findings that sought to investigate and analyse salient issues on the implementation of 5D building information modelling (BIM) from the UK contractors’ perspective. Previous research and efforts have predominantly focussed on the use of technologies for cost estimation and quantity takeoff within a more traditional-led procurement, with a paucity of research focussing on how 5D BIM could facilitate costing within contractor-led procurement. This study fills this current knowledge gap and enhances the understanding of the specific costing challenges faced by contractors in contractor-led projects, leading to the development of 5D framework for use in future projects. Design/methodology/approach To develop a fully detailed understanding of the challenges and issues being faced in this regard, a phenomenological, qualitative-based study was undertaken through interviews involving 21 participants from UK-wide construction organisations. A thematic data analytical process was applied to the data to derive key issues, and this was then used to inform the development of a 5D-BIM costing framework. Findings Multi-disciplinary findings reveal a range of issues faced by contractors when implementing 5D BIM. These exist at strategic, operational and technological levels which require addressing successful implementation of 5D BIM on contractor-led projects adhering to Level 2 BIM standards. These findings cut across the range of stakeholders on contractor-led projects. Ultimately, the findings suggest strong commitment and leadership from organisational management are required to facilitate cost savings and generate accurate cost information. Practical implications This study highlights key issues for any party seeking to effectively deploy 5D BIM on a contractor-led construction project. A considerable cultural shift towards automating and digitising cost functions virtually, stronger collaborative working relationship relative to costing in design development, construction practice, maintenance and operation is required. Originality/value By analysing findings from primary research data, the work concludes with the development of a 5D BIM costing framework to support contractor-led projects which can be implemented to ensure that 5D BIM is successfully implemented.
-
IGR Report: The Virtual Construction Site: A Decision Support System for Construction Planning (Award Numbers GR/N 00890; 00876; 00906)Dawood, N.; Heesom, David; Winch, G.; Penn, A. (EPSRC (Engineering and Physical Sciences Research Council), 2002)The software was a direct outcome of the collaborative EPSRC 'Virtual Construction Site - VirCon' project involving UCL, UMIST, Teesside and Wolverhampton Universities and several industrial collaborators. The software provides a platform for current research and knowledge transfer activities through the West Midlands Centre for Construction Excellence and has directly informed the development of the '3-Centre' collaborative visualisation system which provides support to numerous construction companies.